New Driveway

A growing family means that at some point for most parents, more parking space is required for their children’s own vehicles. In this case, I was tasked to scape off the turf at the front of the house in two areas, then dig down approximately 200mm to allow for an MOT type 1 sub base and a 75 mm tarmac finish. When carrying out this type of work, it is advisable to calculate how many cubic meters will be removed, this will then help you to work out how many and size of skip which will be needed.