Pouring of 16 m3 of concrete
Installation of reinforced megs supported with 1200 x 450 L bars
Construction of base - Base was mass filled with concrete over reinforced steel
Finished base level - Approx. 22m3 of concrete was used to achieve desired level
Installation of new water main and drainage
Installation of drainage and inspection chamber
Digging out of driveway
Digging of Koi carp pond
Completed clockwork for pond
Removal of concrete fence posts
25 ton topsoil used for landscaping
Landscaping